Designing
a frame house fachwerk
Work
on the design of half-timbered cottage starts with
developing a detailed program in conjunction with the architect and
designer. At the initial stage - dating an architect with the customer
is going to background information:
1. location of the site, its size, the difference between the marks
on the site and in relation to the street (if the work is already
done): water, sewerage, electricity, all the engineering connection
if available on the site of their location, the local building rules,
etc. If no such data (customer did not have time to collect them before
the visit to the architect), in which case the surveyor hired. He
collects information for the master plan is a master plan for the
state court which approves the site plan. Planned location of the
house relative to the cardinal points on the site.
2. What are the premises for their intended purpose should be in the
projected half-timbered house
, their size, height and location relative to each other.
3. Planned furniture frame houses in the type or size of furniture
fahvrk ??such as bed which will be in the master bedroom - king size
double bed or regular.
4. Financial aspect for the design half-timbered houses and its construction.
Construction is also divided into stages - preparatory (to prepare
the site for installing the foundation laid by engineering systems),
installation of construction framing assembly boxes at home, finishing
exterior, interior decoration, landscaping of the site. To save money,
projected half-timbered house with exterior and interior
trim materials are chosen according to the customer and the size of
his wallet.
5. Constructive fachwerk. Design of a brick building on the requirements
of gardening and home otlichaetsya fachwerk. Made design drawings,
load calculation, drawings for the company of the manufacturer, assembly
drawings.
During the design of the architect and designer of the project, a
more precise idea of how and what was wanted of him to see. Before
designing framing conditioned house is placed on
the site, determine the assignment of rooms to the sides of the world.
What moves the model home on site - the prevailing winds, sunrise
and sunset, the entrances to the site, an area its character, trees,
nearby buildings, building rules. Architect working on several options
for the location of the cottage on the site, then work with the customer
decide what the best option of all proposed. After a difficult choice
that made the customer on the advice of the architect begins flour
creativity in designing the image of half-timbered houses.
The architect is the image and character of the building, the organization
of future facilities, there are first drafts of the project. Currently,
many journals are published with architectural projects where the
private customer can choose a project he liked. How to be like if
the distance from the magazine project. If this happens, the private
customer chooses not to project, and architect, design (creativity),
which he liked. In the future that would be a picture from the magazine
became a reality, with a focus on the needs of specific customer site,
construction technology, etc. Private customers should contact the
architect of this project. The cost of the architect is about 5% of
the cost of building a frame cottage.