![]() |
TIMBER FRAME HOUSE, CABINFachwerk House, Modern Cabin, Wood House, Chalet Haus |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
MARKET NEWS |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure of the price of the offer - a timber frame construction for the frame house of type fachwerkThe composition of the bid price for the frame of a frame house fachwerk on the technology include: 1.Element frame of laminated timber - a framework for the frame house: beams, pillars, rafters, ceilings, floor joists, beams, top trim, beams of the waist. Skeletal products are made of softwood lumber (spruce, pine) using glue increased durability, price Half-timbered houses fachwerk depends on the material from which made laminated board. Glulam by Functionality for buildings and structures of I-and II-class responsibility (design are used as carriers in residential and public buildings for a period of capital for over 50 years), the equilibrium moisture content does not exceed 12%. Protective and decorative treatment of the price of Half-timbered houses fachwerk is not included, is done separately, depending on the area service framework - Half-timbered houses . Half-timbered houses fachwerk price depends on the amount of material - laminated veneer lumber used to make the frame, Half-timbered houses. Price Half-timbered houses fachwerk can be reduced when the roof system from normal wood (rafter boards) is not glued materal. It is realistic to get on the local market near a construction site. 2.Marking and packaging products of wood (frame) - items are packed in accordance with the stage of assembly, packaged for individual pack (for example the first stage of assembling racks along the axis 1-A pack number 1 and continue in accordance with the instructions for assembling a frame house Half-timbered houses fachwerk). Half-timbered houses price includes the cost of packaging. Package covers the design from dirt and damage in transit. 3.Instructions assembly frame, reference manual (operational map for the production of works) for installation other parts of the house - Number of house elements of the project, materials, consistency of performance. Half-timbered houses fachwerk price includes assembly instructions. And best of all to the assembly carried out by experts with experience in editing Half-timbered houses fachwerk. Half-timbered houses in the price of installation depends on the complexity of the collected units, ranging from 25-35% of the total cubic capacity price Half-timbered houses. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 22.01.2012 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Price structure
Fachwerk project The instruction The wall section Documentation |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||